Home Energy Storage TOU Arbitrage & Payback Calculator

Compare peak and off-peak electricity rates to estimate battery arbitrage savings, payback and 10-year cash flow.

Jump to results

Inputs

Installed storage
Tariffs and dispatch

Results

Estimates
Annual TOU savings$1,537
Simple payback
4.9 years
10-year net cash flow
$7,874
Net upfront cost
$7,500
Battery output per cycle
12.15 kWh
Off-peak input per cycle
13.5 kWh
Annual full-equivalent cycles
365
Annual and cumulative cash flow
$0 Year 0: $-7,500 cumulative, $-7,500 annual 0 Year 1: $-5,963 cumulative, $1,537 annual 1 Year 2: $-4,425 cumulative, $1,537 annual 2 Year 3: $-2,888 cumulative, $1,537 annual 3 Year 4: $-1,350 cumulative, $1,537 annual 4 Year 5: $187 cumulative, $1,537 annual 5 Year 6: $1,724 cumulative, $1,537 annual 6 Year 7: $3,262 cumulative, $1,537 annual 7 Year 8: $4,799 cumulative, $1,537 annual 8 Year 9: $6,336 cumulative, $1,537 annual 9 Year 10: $7,874 cumulative, $1,537 annual 10 Year 0: $-7,500 cumulativeYear 1: $-5,963 cumulativeYear 2: $-4,425 cumulativeYear 3: $-2,888 cumulativeYear 4: $-1,350 cumulativeYear 5: $187 cumulativeYear 6: $1,724 cumulativeYear 7: $3,262 cumulativeYear 8: $4,799 cumulativeYear 9: $6,336 cumulativeYear 10: $7,874 cumulative

Bars show each year’s net cash. The line tracks the cumulative amount. Year 0 is the net installed cost.

Annual cash-flow table
Cash flow by year
YearAnnual netCumulative net
0-$7,500-$7,500
1$1,537-$5,963
2$1,537-$4,425
3$1,537-$2,888
4$1,537-$1,350
5$1,537$187
6$1,537$1,724
7$1,537$3,262
8$1,537$4,799
9$1,537$6,336
10$1,537$7,874

Simple payback assumes flat tariffs and usable capacity. Enter only incentives you expect to receive.

What a battery earns from peak and off-peak prices

The model charges from the grid at the off-peak import rate, then discharges into household load during a more expensive period. It uses AC output after the usable-capacity setting and buys additional off-peak energy to cover round-trip losses. Cap cycles per day using actual load and the available tariff windows.

The results are a constant-dollar, simple-payback scenario. They assume fixed tariffs and capacity and leave out degradation, financing, standby draw, demand charges, export payments and replacements. Enter the expected incentive as an input and confirm eligibility, timing and grid-charge restrictions for your site.

Formulas

  • Delivered kWh/cycle = nameplate kWh × usable fraction
  • Purchased kWh/cycle = delivered kWh ÷ round-trip efficiency
  • Annual savings = (delivered kWh × peak price − purchased kWh × off-peak price) × annual cycles
  • Simple payback = net installed cost ÷ positive annual savings

Worked example

With 10 kWh delivered per day, 90% efficiency, $0.40 peak and $0.12 off-peak energy, the modeled savings are about $973 per year. A $6,000 net cost gives a simple payback of about 6.2 years.

Engineering references

Frequently asked questions

What tariff spread is required to save money?

The peak rate must exceed the off-peak rate divided by round-trip efficiency. At $0.20/kWh off-peak and 90% efficiency, the peak rate must exceed about $0.222/kWh even before capital cost.

Is the 30% option a tax eligibility determination?

It is an editable scenario. Verify current incentives, qualifying cost and eligibility for your installation and location.

Does the calculator include solar exports?

It models grid-charge arbitrage against avoided peak imports. For PV charging, the value of forgone export and the applicable rate schedule require a separate calculation.